Plan for the load at each location
Quays 69–79 have hard-surfaced areas suitable for activities such as bulk cargo unloading. Quays 80–85 have stone and gravel surfaces. Before positioning a crane, transporting heavy cargo or setting down a component, you need to establish the load-bearing capacity at the point of loading.
In this overview, the capping beam is the structural beam along the water’s edge. The quay apron is the working area alongside the quay, and the backland is the area further inland.










